1 Opening(s)
2.0 Year(s) To 8.0 Year(s)
2.00 LPA TO 10.00 LPA
Responsible for implementation of all QA/QC procedures in site
Setting up Quality Control Laboratory as per the contractual requirement.
Maintaining ITP and all other Quality Assurance/Quality Control related Inspection reports.
Conducting Internal audits, preparing audit reports and follow up for CAPA
Conducting Tests on Aggregate, Soil, Cement, Concrete etc... As per the approved ITP.
Conducting ...